
Contract Awarded for Boat Basin and McGee Beach Breakwater
The Marina breakwater was initially constructed in the 1920s, and the concrete cap was added in 1946.
The Marina breakwater was initially constructed in the 1920s, and the concrete cap was added in 1946.