South Texas Community News

View Original

Daytime Closure of Mesquite Street to Shoreline Boulevard

Home Community News Sports Forecast Sponsors About


CORPUS CHRISTI (News Release) - Starting on Tuesday, May 25, the Public Works Department will begin scheduled street improvements on Twigg Street, between Mesquite Street and Shoreline Boulevard. These improvements require a complete street closure and parking restrictions. Construction is expected to last one week, and residents should expect daily closures to occur from 8:30 a.m. to 4:30 p.m.

Traffic Changes & Closures Include:

  • US 181 (Harbor Bridge) from North Beach to Bayfront/Shoreline (Southbound) – US 181 (Harbor Bridge) southbound left lane will be closed from North Beach to Bayfront/Shoreline exit. Vehicles exiting from US 181 (Harbor Bridge) to Bayfront/Shoreline will be detoured to Broadway Street exit ramp.

  • Twigg Street from Mesquite Street to Chaparral Street - Twigg Street will be closed from the US 181 exit ramp. Traffic will be required to follow the Broadway Street exit ramp as a detour to Shoreline/Bayfront. Mesquite Street will be closed at Twigg Street, and traffic will be required to follow the Mann Street Detour. Chaparral Street will be operated with flagger operations on some occasions throughout the day.

  • Twigg Street from Chaparral Street to Water Street - Twigg Street will be closed from Chaparral Street to Water Street. Chaparral Street will be operated with flagger operations on some occasions throughout the day. Water Street (southbound) will have a right lane closure at Twigg Street.

  • Twigg Street from Water Street to Shoreline Boulevard - Twigg Street will be closed from Water Street to Shoreline Boulevard. Water Street (northbound) will have a right lane closure at Twigg Street. Shoreline Boulevard (southbound) will have a right lane closure at Twigg Street.

See this content in the original post